Load cost estimator

Pick a facility that publishes a per-ton rate, a load, and a material. The dollar range uses that rate. It does not decide whether the facility accepts the material.

This estimates a weight from the assumptions below, then multiplies by the facility's published per-ton disposal rate. It is not a quote. The scale weight wins. Call ahead.

Volume, density, and fee assumptions

Level-full volume is cubic yards. Quarter, half, full, and heaped multiply that volume by 0.25, 0.5, 1, and 1.25. Heaped means a pile about 25% above the rails. Tons = cubic yards × pounds per cubic yard ÷ 2,000. The low cost uses the small volume and the light density. The high cost uses the large volume and the heavy density. A published untarped fee is added only when the box is unchecked. A minimum is applied only when the record publishes a dollar minimum. These figures are not city measurements.

Assumed level-full volume
LoadCubic yardsWhy this range
Pickup truck bed2–2.5A short bed level with the rails is about 2 cubic yards. A full-size long bed level with the rails is about 2.5 cubic yards.
Cargo van3–4.5Loose load to about the window line: about 3 cubic yards in a compact cargo van and about 4.5 in a full-size cargo van. This is not the manufacturer's sealed cargo volume.
Utility trailer, 5×82.2–3A 5 by 8 foot floor with 1.5-foot sides is 2.2 cubic yards. The same floor with 2-foot sides is 3.0 cubic yards, loaded level.
Utility trailer, 6×124–5.3A 6 by 12 foot floor with 1.5-foot sides is 4.0 cubic yards. The same floor with 2-foot sides is 5.3 cubic yards, loaded level.
Dump trailer5.3–7.3No single dump-trailer size is standard. The low end is a 6 by 12 foot bed with 2-foot sides (5.3 cubic yards). The high end is a 7 by 14 foot bed with 2-foot sides (7.3 cubic yards), loaded level.
Assumed loose density
MaterialPounds per cubic yardWhy this range
Mixed household or furniture150–300Loose furniture and bagged household trash. A couch is light; a tightly packed load of trash is heavier. This is not a compacted landfill density.
Yard waste250–600Brush and limbs are toward 250 pounds per cubic yard. Wet leaves and grass are toward 600.
C&D debris or shingles700–1,400Mixed construction debris is toward 700 pounds per cubic yard. Asphalt shingles are toward 1,400. Shingles are not named separately in the facility records.
Concrete or dirt2,000–3,000Loose fill dirt is about 2,000 pounds (1 ton) per cubic yard. Broken concrete is toward 3,000. A solid slab is closer to 4,000 pounds per cubic yard and is outside this range.